This page was made for your team.
Share it with a colleague
Telamont
Armcorp Construction

We found 15 risks in your Dayton 6S documents.

Here are 3 of the 15 risks we found in the public Dayton 6S package, each with the clause and page it comes from.
Dayton 6S
What we found in the
Dayton 6S
documents
Finding

Existing control system: capacity and spare points are not documented for the BACnet/IP integration

Section 23 09 23 asks the contractor to integrate the BACnet/IP network with the existing control system and to verify its capacity, network and reserve before work starts. No point count, network capacity or system configuration is provided, so the expansion cannot be sized from the documents.

Specifications, Section 23 09 23, p. 10
Finding

Sprinkler sizing depends on a flow test that the package does not provide

Section 21 13 13 requires the hydraulic demand to stay at least 10 percent under the available supply curve, but the water supply is set by a flow test performed before construction. Without the curve, pipe sizes and equipment cannot be fixed, and no mechanism adjusts the price once the test is done.

Specifications, Section 21 13 13, p. 580
Finding

Flooring substrate tolerance: 1/4 inch in one section, 1/8 inch in another

Section 09 05 16 limits the deviation to 1/4 inch over 10 feet, while Section 09 65 16 requires 3 mm (1/8 inch) for the sheet flooring substrate. The tighter tolerance changes the leveling work under the flooring.

Specifications, Sections 09 05 16 and 09 65 16, p. 507
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

Book a 30-minute demo on the Dayton 6S package. It is already set up, so there is nothing to prepare: we go through every risk with the page it comes from, and the ones worth raising with the VA now.

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

Congratulations on the Dayton 6S award. Before your crews mobilize, we ran Telamont on the public solicitation package to see what your team will be working with. A few items are worth settling with the VA early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo