We found 4 risks in your US 87 Victoria documents.

Here are 3 of the 4 risks we found in the public US 87 Victoria package, each with the clause and page it comes from.
US 87 Victoria
What we found in the
US 87 Victoria
documents
Finding

US 87 warning signs are 30 inches on the Phase 2 sheet, while BC(2)-21 requires 48-inch CW20 signs

BC(2)-21 requires 48 x 48 inch CW20-series signs in the Expressway/Freeway column. Phase 2 Sheet 1 calls for 30 x 30 inch CW20 signs. Signs bought to the plan may not meet the standard at acceptance.

Plans, Phase 2 Sheet 1 · BC(2)-21
Finding

The existing irrigation system must be removed and capped, but the set gives no extent, cap locations or method

Sheet 162 requires removal and capping of the existing irrigation system. The proposal lists item 496-7019 only as retaining wall removal, so no bid item covers the irrigation work and no extent is stated.

Plans, sheet 162 · proposal item 496-7019
Finding

Temporary pedestrian routes have no bid quantity or location, and their installation, maintenance, fencing and removal are subsidiary to the sidewalk item

Sheet 310 requires temporary sidewalk work, passing areas and protective fencing. It leaves the route location to the Engineer and gives no bid length or area.

Plans, sheet 310
Book a demo

One avoided issue usually pays for the platform. Customers report a 12 to 15x return.

Over $2 billion in projects covered
Béland Lapointe logo
Groupe Malo logo
Telamont in 90 seconds

Telamont reads every document on your projects and flags the risks.

  1. Connect your projects. Drawings, specs, contracts and addenda, straight from Procore, Autodesk Construction Cloud, SharePoint, Box or Dropbox.
  2. Get the risks, with the page. Conflicts, gaps and costly obligations, each linked to the page it comes from.
  3. Assign and follow up. Your team triages each risk and gives it an owner.
  4. Stay covered as documents change. New revisions and addenda are checked as they arrive.
Book a demo

See how contractors catch risks early with Telamont

$16.4M in potential costs avoided by our customers
Who you will meet
Alexandre Knox
Alexandre Knox
Your account owner
Nathaniel Nadeau
Nathaniel Nadeau
Runs your demo

Request received

Our team will reach out shortly to plan your demo.

Prefer to pick a time yourself?

Choose a time to meet
Oops! Something went wrong while submitting the form.
Return on investment

What our customers got from Telamont

$1.4M

Of rework avoided on one customer project, after a conflict was caught before execution.

40 to 50 h

Of document review saved per project, reported by a customer.

12 to 15x

Typical return on the platform. One avoided issue usually pays for it.

A note from our co-founder

The US 87 job in Victoria packs sidewalks, curb ramps and signal work into 255 working days. We ran Telamont on the public TxDOT package to see what your team will be working with. A few points are worth settling with the district early, and I would be glad to walk you through all of them.

Charles Goulet
Charles Goulet, Co-founder and CEO, Telamont

Questions from teams like yours

Site engineer reviewing project documents on a tablet
Are our documents private?

Yes. Your documents are never used to train AI models, ours or our providers'. They are encrypted in transit and at rest, and each organization's data is kept separate.

Which documents does Telamont read?

Plans, specifications and special provisions, contracts, addenda, and supplemental reports such as geotechnical and hazardous materials surveys.

How long does it take to get started?

Days, not months. After the walkthrough, one onboarding meeting trains your team and connects your projects, and the first risks come back with their pages.

Does it work with our tools?

Yes. Telamont connects to Procore, Autodesk Construction Cloud, SharePoint, Box, Dropbox and Microsoft Project, and sends alerts to Teams, Slack, Outlook and iMessage.

Get a 30-minute demo of Telamont
Book a demo